WHAT? With temperatures predicted to drop into the low 30’s tonight, please dress in warm layers for maximum comfort and flexibility when on campus.
WHY? As described in T-Dust Alert #19, due to construction the ability to heat the campus has been interrupted.
WHERE? The temperature in all campus buildings will be affected.
WHERE ELSE? Hot water supplied by the boilers is also used to heat water in the swimming pool, showers, and restrooms.
HOW LONG? Estimates are that work will be completed and the ability to heat campus buildings will be restored by the end of the day on November 24.
WHERE ELSE? Previous T-Dust Alerts and construction updates may be found at http://www.richlandcollege.edu/construction